2017-01-01 Final Costs for the Boiler Works
2016-12-20 The cost for boiler works has doubled!
2014-02-28 Section 20B - Boiler House Refurbishment
2013-09-10 Heating Was Switched On Yesterday (09-09-2013)
2013-09-02 Boiler Room Works Update
2013-07-23 Hot Water Shut Down on Monday 29th July 2013
2013-07-12 Renewal Of Boilers - Update
2013-07-09 Total Of 16 Pumps Inside the Boiler House - 13 Ancient and 3 New
2013-06-03 New Information About The Major Works 2
2013-06-03 Apollo Letter About The Works
2013-06-03 No Hot Water on 04-06-2013
2013-05-30 New Information About The Major Works (Boiler Room)
2013-05-29 No Heating to All Properties on the Estate
2013-05-02 Heating and Hot Water Shut Down to All Blocks
2013-05-02 Heating System Replacement - Phase 2
2013-04-09 Heating System Replacement - Phase 2 Meet The Contractor Meeting
2013-01-29 Extra Information About The Proposed Works (Boiler Room)
2013-01-11 Feedback For The Proposed Boiler Room Refurbishment
2012-11-04 Notice Of Intent to carry out Boiler Refurbishment and Associated Works
2013-2017 Boiler House Refurbishment
2011 Water Tank Repairs
2011 Gas Supply Works
2010-2011 Heating Works
2010-2011 IRS System
2001 Windows & Doors
2001 Security Works