TDK Mechanical Service Ltd is carrying some works this morning inside the boiler house. We do not know if the current works are related to the ones which GEM carried out yesterday or if they are related to the repair of the Zone 2 pumps.
The Zone 2 pumps have been identified on Tuesday evening (14th February 2017) as the source of noise to the flats above the boiler house. Mr John Stow has instructed GEM supervisor to recondition/repair the pumps asap.